Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Note

Note
Version & Component Sync will apply changes to versions/components retroactively upon creating the project link.

In the example below we will create a project link with a project that has existing versions:

Project: VCS - Source (team managed)

Versions: 1.0.0 & 2.0.0

VCS DC - Existing project (1).png

Project: VCS - Target 1 (team managed)

Versions: 1.0.0 & 3.0.0

VCS DC - Existing project (2).png

To share versions/components from the VCS - Source project, we will create a project link with project VCS - Target 1

  • Navigate to the Version & Component Sync page in the Source project.

  • Click on Create a project link

VCS DC - Existing project (3).png

VCS DC - Existing project (4).png

  • Select the project(s) you want to link to the Source project. Versions from VCS - Source will be propagated to selected project(s)
    In this example we will create a project link with VCS - Target 1

  • Click on Next:Synchronisation
    In this example we will use the default Scheduling & Trigger settings.

VCS DC - Existing project (5).pngImage Removed
VCS DC - Existing project (6).pngImage Removed

  • Click on Next: Filters

VCS DC - Existing project (5).pngImage Added
VCS DC - Existing project (6).pngImage Added

  • The app will now show an overview of the versions that will be synchronised from the source project to the target project
    By creating filters you can control which versions are in-or excluded from synchronisation. In this example we will not use any filters.

VCS DC - Existing project (7).pngImage Removed
  • Click on Next: confirmation

    VCS DC - Existing project (8).pngImage Removed
VCS DC - Existing project (7).pngImage Added
  • The app will now show an overview of the project link(s) you are creating

  • Click on save, to save the project link(s)

    VCS DC - Existing project (8).pngImage Added
  • Upon clicking on save, the app will:

    • Start synchronising

    • Shown an overview of the created project links and their current status

VCS DC - Existing project (9).png

Synchronisation

Upon creating a project link between VCS - Source & VCS - Target 1 the app checks whether there are versions present in VCS - Target 1

Version 1.0.0

  • The app recognises that version 1.0.0 in VCS - Source already exists in VCS - Target 1

  • The app links version 1.0.0 in VCS - Source to version 1.0.0 in VCS - Target 1

  • This links ensures that any and all version changes to version 1.0.0 in VCS - Source are synchronised to version 1.0.0 in VCS - Target 1

Version 2.0.0

  • The app recognises that version 2.0.0 does not exist in VCS - Target 1

  • The app creates version 2.0.0 in VCS - Target 1

    • Jira does not allow you to link a single version to multiple projects. Therefore the app needs to create ‘new’ versions in VCS - Target 1

  • The app makes sure that upon creation of the ‘new’ version 2.0.0 in VCS - Target 1 it is linked to version 2.0.0. in VCS - Source

  • This links ensures that any and all version changes to version 2.0.0 in VCS - Source are synchronised to version 2.0.0 in VCS - Target 1

Version 3.0.0

  • The app recognises that version 3.0.0 in VCS - Target 1 does not exist in VCS - Source

  • The app deletes version 3.0.0 in VCS - Target 1

Project: VCS - Source (team managed)

Versions: 1.0.0 & 2.0.0

VCS DC - Existing project (12).png

Project: VCS - Source (team managed)

Versions: 1.0.0 & 2.0.0

VCS DC - Existing project (13).png

To edit or delete a existing project link:

  • Navigate to the Version & Component Sync page in the target project or click on the Linked project link on the Version & Component Sync page in the source project

  • Navigate to the Settings tab

  • Here you change the apps synchronisation method, log lever or delete the project link all together

VCS DC - Existing project (10).png
VCS DC - Existing project (11).png