In the example below we will explain how to create a project link with a Linked project and keep pre-existing versions/components. In order to create this project link we will use the synchronisation mode Advanced. If you are not yet familiar with the different synchronisation modes, please read the following documentation first.
Create project link
In the example below we have the following set-up in Jira:
Project: Master (MAS)
Versions: 1.0.0 & 2.0.0
Linked Project 1 (LP1)
Versions: 4.0.0 & 3.0.0
To share versions/components from the Master (MAS) project, we will create a project link with project Linked Project 1 (LP1)
Navigate to the Administration interface of the Master project.
Go to the Version & Component Sync page
Click on Get Started
Make sure to thoroughly read the message in the pop-up modal before you click on continue
Select the project(s) you want to link to the Master project, Versions from Master will be propagated to selected project(s)
In this example we will create a project link with Linked Project 1
After selecting Linked Project 1, click on Next:Synchronisation
On the next screen you can choose your desired synchronisation mode, Simple or Advanced
As explained in synchronisation modes section, we We will create a project link using the Advanced synchronisation mode
After choosing the Advanced synchronisation mode, the app will provide you with the option to configure which events should trigger a synchronisation.
By unchecking the Delete event, the app will no longer remove versions from the Linked project that do not exist in the Master projects
Note |
---|
Note
|
Please uncheck the Delete event and click on Next:Confirmation
The app will now show an overview of the project link(s) you are creating
Click on save, to save the project link(s)
Upon clicking on save, the app will:
Start synchronising
Shown an overview of the created project links and their current status
To edit or delete a existing project link click on the triple dot menu on the right of the project link
To provide you with insights in how the app works, this is what happens during synchronisation:
Upon creating a project link between Master & Linked Project 1 the app checks whether there are versions present in Linked Project 1
Version 1.0.0
The app recognises that version 1.0.0 in Master does not exist in Linked Project 1
The app creates versions 1.0.0 in Linked Project 1
Jira does not allow you to link a single version to multiple projects. Therefore the app needs to create ‘new’ versions in Linked Project 1
The app makes sure that upon creation of the ‘new’ version 1.0.0 in Linked Project 1 it is linked to version 1.0.0 in Master
This links ensures that any and all version changes to version 1.0.0 in the Master project are synchronised to version 1.0.0 in Linked Project 1
Version 2.0.0
The app recognises that version 2.0.0 in Master does not exist in Linked Project 1
The app creates versions 2.0.0 in Linked Project 1
Jira does not allow you to link a single version to multiple projects. Therefore the app needs to create ‘new’ versions in Linked Project 1
The app makes sure that upon creation of the ‘new’ version 2.0.0 in Linked Project 1 it is linked to version 2.0.0 in Master
This links ensures that any and all version changes to version 2.0.0 in the Master project are synchronised to version 2.0.0 in Linked Project 1
Version 3.0.0
The app recognises that version 3.0.0 in Linked Project 1 does not exist in Master
Due to the unchecking of the Delete event, the app won’t delete version 3.0.0 in Linked Project 1
Version 4.0.0
The app recognises that version 3.0.0 in Linked Project 1 does not exist in Master
Due to the unchecking of the Delete event, the app won’t delete version 3.0.0 in Linked Project 1